How long does it take to renovate an apartment?

Short answer — The timeline depends on scope: a refresh generally takes weeks, a heavy renovation (services, partitions, kitchen, bathroom) several months. Lead times, especially for bespoke items, are often the deciding factor, which is why a written schedule from the quote stage matters.

The phases in the right order

  1. Diagnosis and plans.
  2. Demolition and strip-out.
  3. Partitions, electrics and plumbing.
  4. False ceilings, plastering, joinery.
  5. Floors, tiling, painting.
  6. Kitchen, bathroom, bespoke furniture.
  7. Cleaning and handover.

What lengthens the timeline

  • Discoveries during works (damp, worn services).
  • Late ordering of joinery or bespoke furniture.
  • Changes of scope along the way.
  • Permits or co-ownership approvals.

How to secure the schedule

Have all material choices approved before starting, order long-lead items first and ask for a schedule with checkpoints.